The Swiss energy group was given the contract throughits subsidiary Kraftanlagen München.
The go-ahead for the project was given with thesigning of the contract on 3 August 2015. The 190 MW power station will beimplemented in cooperation with GE Jenbacher, the supplier of the gas engines.
The