Capacity at Oskarshamn 2 (590MW) 2 will be reduced to 480 MW from 16:30 cet today, October 21, OKG Aktiebolag told Nord Pool.
The power reduction is due to drain pipe vibrations in the preheater system.
The
The power reduction is due to drain pipe vibrations in the preheater system.
The