Swedish nuclear power reactor Ringhals 3 (985 MW) was back in operation with 1 turbine at 23.20 last night, Ringhals AB told Nord Pool.

Powerincrease in small steps. During startup some test will be performed 95,4% is expected 3 days after first syncronising.

The